Progress Summary: What I've accomplished and what needs doing

Healey Journal

HomeJournalCarsWorkshopLinksSite Information

What's HappeningProgress SummaryImportingThe Past

An outline summary of progress to date, those items in the acquired/completed column represent work and progress achieved, the needed column necessarily represents a larger volume of tasks to be done.

Overall Progress to Date:

Component

Acquired / Completed

Needed

Battery

 

defer until near completion

Brakes

lines, fittings, rear cylinders, shoes & uprated 4-piston Toyota calipers, trim dust shields.

rebuild servo (rebuild kit acquired -  to do 2009)

Chassis

reinforcements installed, inner body mounted.

 

Clutch Hydraulics

completed- master & slave cylinders and line.

 

Clutch

clutch disk, pressure plate & throwout bearing

 

Cooling

oil cooler & fittings

heater hoses (to do 2009)

Dash

oil pressure & water temp gauges. Glove Box Knob acquired!

need cover, refinish wood

Doors

 

need refurbishment, have all major internal components.

Drive Train

Balanced D/S & new Universals installed rebuilt Rear Axle, Over-drive & Transmission

 

Electrical

Components acquired

 

Engine

Alloy valve cover, Alloy Oil Pan, Mallory Distributor

everything else...

Exhaust

completed- Tubular Exhaust Header, side-exit muffler, hangers and all ceramic coated to minimize heat.

 

Fuel

Carbs & Air Cleaners, Manifolds, Facet Pump, Filter/Regulator, Lines & Fittings

carb lines, throttle linkage (to do 2009)

Glass

completed

 

Hardware

completed- stainless steel where suitable, new every where else.

 

Inner Body

mounted

 

Interior

seat pans & brackets, squabs, slides, Boot trim kit

seat cushions, covers, interior panels, carpeting, seat belts, boot trim, dash cover

Outer Body

All wings on hand, Bonnet Louvred

bodywork on shrouds

Painting

POR-15 Primer acquired and applied, Chassis & Inner Body BRG Paint Acquired

exterior painting

Rubber

completed

 

Steering

Motolita steering wheel acquired. New tie-rods ends.

Conversion Steering box & idler (to do 2009)

Suspension

completed- have uprated and tubular shocks, uprated springs, poly bushings, rebuilt rear axle & Quaife differential.

 

Tires

Alloy wheels acquired.

Tires  (to do 2009)

Top

Top frame sandblasted and primed, Used but useable top acquired.

recondition top frame, tonneau, cover & install

Trim

 

replate, need rear cockpit surround.

 

Details:

  1. Chassis (installed reinforcing fabrications)
  2. Inner Body Components (acquired: new front, main & rear floors new left & right rear "kick" panels & old transmission tunnel (reused) reused inner floors by transmission tunnel & fabricated triangular left & right inner floors by tunnel inner, intermediate and outer sills outer footwell, reinforcing and hinge panels door close panels, rear inner wings and wheel arches, will reuse old top mount brackets left, right and main boot floors and battery panel new front wheel arches and extensions, reuse old front panel and cross brace).
  3. Outer Body Components (acquired: 4 wings, boot lid, old bonnet louvred need: bodywork on shrouds)
  4. Fuel (acquired: carbs, fuel pump, lines, fuel filter/regulator need carb lines, throttle linkage)
  5. Cooling (acquired: radiator, main hoses, oil cooler, lines and bracket spin on oil filter need: heater hoses)
  6. Brakes (acquired: lines, fittings, rear cylinders, shoes& uprated 4-piston Toyota calipers need: rebuild servo)
  7. Clutch hydraulics (acquired: master & slave cylinders & lines)
  8. Electrical (acquired: all wiring, switches, overdrive throttle switch, flasher unit, solenoid. fuse block, relays, new head and other lights)
  9. Steering (acquired: steering wheel, tie-rod ends need RHD steering box & idler)
  10. Suspension (acquired: new left hubs, reamed kingpins & rebuilt front shocks, rear shocks, front & rear anti-sway bars, poly bushes, new front & rear springs, alloy wheels)
  11. Dash (acquired mirror, have vent surrounds need cover, refinish wood)
  12. Trim (have old grille, grille surround, bonnet grille & surround, windshield frame, door wind frames, head light surrounds, door chrome & finishers new: boot hinges, boot handle need: replating)
  13. Rubber (all, I think...except tires - too much little stuff to list!)
  14. Hardware (all, I think... too much little stuff to list!)
  15. Drive train (acquired: D/S balanced, rebuild transmission and overdrive rear end rebuilt & LSD installed)
  16. Glass (have all)
  17. Doors (have internal components need refurbishment and reassembly)
  18. Engine rebuild (needs everything! will do last).
  19. Interior (acquired: seat frames, bottoms, squabs, slides, packing strips and boot trim kit need: seat cushions, covers, carpets, interior panels, seat belts)
  20. Top (need to recondition frame, top, top cover, tonneau)
  21. Exhaust (have: header, side-exit muffler)
  22. Clutch (need: plate, pressure plate, throwout bearing)
  23. Painting (need: exterior materials)
  24. Plating (need: windshield frame, door window frames, grille & surround, hood grille & surround, door finishers)
  25. Tires (need: 4 + spare, will do last)
  26. Battery (will do last)

In the past compiling this report has always been something of a let down: I'd be going along thinking I'd achieved quite a lot but find that once I put it down in black and white I still couldn't check anything in particular off as being finished. All the necessary things I'd been working on took forever, and people I needed took even longer, or got ill, or made other plans for me.... but now- its all starting to come together and take shape like as car rather than an enormous pile of parts.

e-mail me

Copyright © 2008 James M. Wilson All rights reserved.